Hull Group – 1947 36' Restoration

Page in development

Click on image to begin slide show.

5200 Bottom

Gripe and Bow Stem

Plank Replacement

Bow Deck

Bow canvas and hardware removed.
Bow canvas and hardware removed.
Deck removed. Support added for anchor winch.
Deck removed. Support added for anchor winch.
Two frames and feather board built for deck slope.
Two frames and feather board built for deck slope.
Oak deck frames.
Oak deck frames.
Frame end detail.

Frame end detail.

Okoume sub deck
Okoume sub deck
Before
Before
New
New
Mahogany glue up rough cut.
Mahogany glue up rough cut.
Rough shaped with electric hand planer.Rough shaped with electric hand planer. Design and mock up for 1931 anchor davit windless and bow pulpit. Davit cable pulley is open on one side so cable lowers in line from windless to bow roller on pulpit.  Copper cable is supple like a rope. Entire davit windless rotates 360 degrees.
Design and mock up for 1931 anchor davit windless and bow pulpit. Davit cable pulley is open on one side so cable lowers in line from windless to bow roller on pulpit. Copper cable is supple like a rope. Entire davit windless rotates 360 degrees.
Wooden Boat Magazine.Wooden Boat Magazine. Teak glue up for bow pulpit and anchor deck rest. Tape experiment for glue squeeze out removal time comparison. 12” x 24” pieces will be 24” x 24”.  12” width to run through planer then one joint final glue.Teak glue up for bow pulpit and anchor deck rest. Tape experiment for glue squeeze out removal time comparison. 12” x 24” pieces will be 24” x 24”. 12” width to run through planer then one joint final glue. Glue up completed for Anchor Pulpit and Anchor Rest. If you use tape be sure its 3M quick release.  Epoxy will penetrate cheaper tape.  Wax paper works great to keep epoxy off the clamps.Glue up completed for Anchor Pulpit and Anchor Rest. If you use tape be sure its 3M quick release. Epoxy will penetrate cheaper tape. Wax paper works great to keep epoxy off the clamps.
1 7/8” Deck Teak battens: Left stack forward deck 988 LF. Middle stack aft deck 440 LF.1 7/8” Stateroom Sapele Ribbon Stripe Mahogany battens: Right stack 648 LF.1 7/8” Deck Teak battens: Left stack forward deck 988 LF. Middle stack aft deck 440 LF.
1 7/8” Stateroom Sapele Ribbon Stripe Mahogany battens: Right stack 648 LF.
1 7/8” Deck Teak battens: Left stack forward deck 988 LF. Middle stack aft deck 440 LF.
1 7/8” Stateroom Sapele Ribbon Stripe Mahogany battens: Right stack 648 LF.
11” Teak Planks: Side Decks 40 LF.  Transom Deck 12 LF11” Teak Planks: Side Decks 40 LF. Transom Deck 12 LF New Teak deck extends under windshield to salon bulkhead.New Teak deck extends under windshield to salon bulkhead. New Teak substrate for Mahogany bow rails.New Teak substrate for Mahogany bow rails. Teak Battens attached to deck with Fitting Epoxy and White Oak buttons. Separated 1/8th inch for caulk with Alaskan White Cedar spacers not to damage teak.  Firmed from side with driven wedges.Teak Battens attached to deck with Fitting Epoxy and White Oak buttons. Separated 1/8th inch for caulk with Alaskan White Cedar spacers not to damage teak. Firmed from side with driven wedges. Forward deck Teak battens in place. Bow deck will also be full Teak batten deck.Forward deck Teak battens in place. Bow deck will also be full Teak batten deck. Breast Hook deck preparation to prevent water seepage.Breast Hook deck preparation to prevent water seepage. Breast Hook Pieces.Breast Hook Pieces. Breast Hook in place.Breast Hook in place. Bow Deck ready for Teak battens.Bow Deck ready for Teak battens. Bow Deck Teak battens being installed.Bow Deck Teak battens being installed. Teak decks installed and Mahogany Rub Rails faired.Teak decks installed and Mahogany Rub Rails faired. Bow Deck, Windshield, Cabin Sides, and Walk Decks completed.Bow Deck, Windshield, Cabin Sides, and Walk Decks completed. lightbox jquery plugin by VisualLightBox.com v6.0m

Bow Hatch

Bow to Side Deck Step Down

Windshield

Cabin Planking

Side Rails

White Oak Rub Rails

Miscellaneous

Transom

Finish